Grid tied solar energy systems must submit an application to the local distribution company (LDC) before connection is permitted. The application is called a ‘connection application’. Each utility has its own forms and requirements. Some connection applications must be accompanied by a fee.
The process for large systems (>10kW of inverter rating) is much different than for small systems.
When you work with Generation Solar to design, supply, and install your energy system we will take care of the connection application for you.